memoscan
← all memos

Memo 0x7192ed40…665b22 on Ethereum

About the solar pump , it working perfectly , I checked it before I travel , I'm at lagos at the moment ,The solar pump is orudu (ogun state ) . When I get back to that vicinity , I will do the video and send it back to your ASAP. +1 > 5–7.5kVA inverter is roughly 4–6 kW usable continuous power > > One listing for this class of Hisense 10.5/6kg washer-dryer shows ~305 kWh per 100 cycles for wash+dry versus ~52 kWh per 100 cycles for wash-only. > > Even if you never use heated drying, 6 machines running together + motor surges + pumps + control electronics can already push a 5–7.5kVA setup into brownout/overload territory. > > A 5kVA system is undersized, and 7.5kVA leaves no margin. > > Notes: (looks like you need ~5x setup) > > - Required inverter (continuous): ~18–20 kW > That’s roughly 22–25 kVA (depending on power factor). > > - Realistic battery range with dryers in use: ~30–60 kWh > > - With dryers in real use: ~11–22 kW of panels > If panels are 450W each: > 11.2 kW ≈ 25 panels > 16.8 kW ≈ 38 panels > 22.4 kW ≈ 50 panels > > Conclusion > > If dryers are used as advertised, you’re looking at roughly: > ~22–25 kVA inverter, ~30–60 kWh battery, ~11–22 kW solar PV (depending on cycles/day). > > The proposal specifies: > 5–7.5 kVA inverter, 10–15 kWh battery, 10 panels, with no load control plan. > > Feels like a technical mismatch. Also interested to see how to solar pump is doing, any video footage etc?