> Hello, I want to start of by saying that I want this project to succeed and all my comments are an attempt to make that happen. I'm a Licensed Civil Engineer in the States with 10 years experience (Commercial Land Development, Public Infrastructure) and currently work in a multi disciplinary engineering form (Civil, Structural, Process, Architectural, MEP, Landscape, etc)
>
> 1.) Have you considered splitting the prop into phases such as (Design and Permitting, Construction, Marketing)? Items discovered during design can often increase the cost of the project and delay schedule. It's very rare to have a detailed construction budget at the beginning of a project before design that remains valid. Having it split into phases will protect you and the DAO (highly recommend)
>
> 2.) Has this construction firm ever worked on public infrastructure such as a medical center? On my first glance it appears they were focused on residential construction. A more detailed portfolio of projects they worked on would be great
> No mention of civil design. The renders and photos of the site indicate a good deal of civil design work that would be needed (pavement/pavers, a culvert for the driveway crossing the channel out front, potential need for storm water management features). I've encountered the situation frequently where Non-Civil engineers are quick to take on Civil design tasks because they appear “easy” and make costly mistakes.
>
> 3.) Would you be doing the Construction Administration and QA/QC work or will this be done by another company/individual?
>
> 4.)Overall cost appears very low for a new building and site. Have you seen a comparable facility in the region go up for this price?
>
> 5.)No cost provided for demolition of existing building?
>
> 6.) Are you interested in having 3rd party reviews of design plans/specs? I am willing to look at any civil plans and calculations for free. If you want additional disciplines reviewed, I could talk with my coworkers.
>
> 7.)Have you confirmed this is all the medical equipment that would be needed by staff?
>
> 8.)Who will ultimately own the facility after construction?
>
> Love what this project is trying to accomplish but I think this should be done in a more phased approach. If you want further input or need clarification, feel free to reach out.
+1
> @0x6E61...2D47
>
> GM thanks for responding, I'll keep the feedback flowing. i realize i messed up my numbering in my first comment. My apologies for any confusion that may bring
>
> 1.) What I meant by phases is that you would revise the prop so it only covered design+permitting. Once the final design is in hand with all permits and a cost estimate is done, you would submit another prop for the funds needed for construction. Again, I highly recommend this.
>
> 2.) Could you or the construction company provide a list of projects they constructed and for who?
>
> 3.) Prop has no mention of civil design or civil cost items. Civil is a discipline of engineering that is outside the building (pavement, grading, stormwater pipes, utilities) These items are not <$500 / miscellaneous.
>
> 4.) Lets get those individuals listed on the prop with their experience and the role they will have.
>
> 5.) Good to hear that a similar facility was put up for this cost, however, I still have some doubt. i think addressing item 1 would make this go away.
>
> 6.) No cost given for demolition of the building. I understand the construction company has given you a price for construction, however, thats always subject to change if design+permitting is not completed
>
> 7.) Just let me know whenever you want draft plans/specs/prop reviewed.
>
>
>
> >
> >
> > @otterfodder.eth
> > Thanks for the response sir , it's highly appreciated.
> > Every details and response given here is highly acknowledged sir .The details in this prop is for for a standard health centre not standard hospital sir
> > *Hospital is larger in size than health centre
> > *Service offered in hospital is more larger than health centre and many more.
> >
> > All the prices given have been confirmed by the construction company and the staff.
> > 1. Under the budget breakdown (item 1) I think it has been attended to .
> > 2.yes
> > 3.will be done by the Nouns team in Nigeria and other individual in the area of expertise.
> > 4. Health centre not hospital sir .
> > 5. Miscellaneous expenses will be used sir .
> > 6.yes
> > 7. Yes
> > 8.This a public health centre,the local community
> >
>
>
> Theres a lot of variables in building and site construction that can't always be seen at the beginning of the project. IMO, Funding this in 2 props, one for design+permitting, and the second for construction should be the route forward. This is a very common practice with good reason. I'm open to helping you draft the design+permitting prop/scope.